Rated 5 / 5 from 1 reviews
5
1
4
0
3
0
2
0
1
0
Website
Call
Windemuller As technology has advanced and modernization has crept into every faction of American business and industry, Windemuller has proceeded with it. Since our inception, we have consistently expanded our electrical services department, adding specialized skills in industrial, commercial and institutional electrical construction, as well as in electrical service, communications systems, automation services, information technology services and outdoor utilities.

In addition, we added design/build services and a service department that is available to answer your needs 24 hours, seven days a week.
Services
Interconnection Substations
Report
Power substations are a series of large transformers that step down high-voltage power to a series of circuit breakers and distribute that lower voltage to the area being served. Substations for renewable projects perform the opposite function, stepping up the voltage to interconnect within a utility transmission system.
Commercial Scale Wind
Report
Windemuller specializes in turnkey design and installation of commercial scale wind turbine systems. Sizes can range from 2.4kW Skystream type units on 50-70ft. towers to 250kW units on 90m towers. Interconnections can be made directly into the customer's electrical system or metered separately separately through the utility.
Renewable Energy
Report
Windemuller's expert design and construction professionals are able to help take your renewable energy project from concept through construction and into operation. Our trusted ability to study, negotiate and determine the optimal availability of transmission infrastructure is key for site selection and layout.
PV Solar
Report
Windemuller has been in the renewable energy business for over a decade and are more than ready to meet your solar power needs. We have worked with a variety of different PV (photovoltaic) systems, from Commercial Scale systems to 5MW Utility Scale set-ups, and have expert experience on-hand to help in the design and construction of both types.
Utility Scale Wind
Report
Windemuller's utility scale wind farm experience began back in 2000, with the installation of two 1MW NEG Micon wind turbines in Mackinaw City, Michigan. This project, while small compared to today's projects, allowed us to pioneer new skills and become experts in wind energy electrical balance-of plant design.
Reviews (1)
Write a Review
Makayla Andersen
Apr 17, 2020
The apartment complex is located within walking/biking distance to Holland State Park, Winstrom Park, Stu Visser Trails and the county fair grounds. The complex is clean and the landlords are friendly. Maintenance requests are fulfilled within a timely manner.